What's New for 2017!

January 29, 2017

One month into the New Year and most have already broken their resolutions for 2017, but at Lake Forest Shores it's a different story; we're on schedule to completing the re-piping project. As you may have already noticed, the re-piping project conducted by "Repipe 1" has already started and should be completed by the end of the month, January 31, 2017. Each unit should only take 3-days to complete. The following gives you a guideline as to what is expected each day, minus the painting (explained further down):

Day 1 - Repiping (PEX plumbing and each unit will have own water valve)

Day 2 - Inspection (Inspection of the property by the City of Lake Forest)

Day 3 - Dry Wall (Walls/ceiling are patched and ready for painting)


Again, below is the link to the downloadable schedule for your review. Each phase/location within the complex will be labeled with a start date.

Download the repipe implementation schedule in PDF format

If you will not be present on the specified scheduled dates for the repiping, it is the resident/owner's obligation to make arrangements for garage access to limit the chances of delayed repairs. Below is the information to call:

Jenny or Veronica @ Repipe 1 - (866) 737-4731

If access to your garage is not granted, a locksmith will be on the premises to assist with gaining access to ensure completion of the project in a timely manner. All fees incurred will be billed to the resident.

Contractor trucks parked along side of garages working to fix drywall
Repipe One workers fix damaged drywall in garages

Futhermore, an amendment to the CC&R has been made by the Board to ensure cooperation of all residents in minimizing delayed work and inconvenience for everyone. The below emergency rule was adopted on December 6, 2016 and will remain in effect for 120 days:

"The Association will undergo a re-piping project in early 2017. The Construction Manager has initiated scheduled walk-throughs with occupants to inform occupants as to how they must prepare for the re-piping work. Occupants must provide access to their home for the Construction Manager's walk-through and to the plumbing contractor when the work actually begins until such time as work has been completed in that home. An occupant's failure to provide access to the home on a scheduled day for a walk-through or construction shall result in a fine of $500 per day to the owner of the unit for each day access is needed and not provided."

Lastly, let's talk about your painting options. Once the walls have been patched and textured, a separate painting contractor has been hired by the Association to color match and paint the walls that have been effected by the re-piping. On the other hand, in order to SAVE MONEY, the homeowner(s) can opt to take care of the painting on their own. This would save the Association money by not having to pay the full amount per unit to the painting contractor.

I'm sorry, what?!

Based on what I've read, the contractor gets paid $990 per unit. If the homeowner chooses to take care of the painting, a credit of $500 will be applied to their monthly HOA bill. Great, right? But wait a second...

Paint contractor truck parked outside one of the Lake Forest Shores units

Where is the additional $490? Why does it cost this much for a painter to take care of a couple walls? If you add up the amount of units at the complex, the contractor is making approx. $86,130 for work done within a 1-month period. What was the Board thinking when this was passed? Already the decision to re-pipe the complex came approximately 2-3 years too late and the cost accrued by the community was in excess of $284,000 within a 3 year period to cover water intrusion expenses. Nothwithstanding, the homeowners are left with a debt of $7,011+ (depending on if they can pay the full amount without incurring interest charges). Whatever the reason for this cost, I'm sure the Board could have done better on the cost with the same results.